Acceptance Test Services


Ensuring introduction of a machine in perfect condition in the line is more important than perfect monitoring and diagnosis. To achieve this goal, the stage of acceptance test that precisely diagnoses and approves performance, design and the condition of the machine is required before the introduction or after the repair. The acceptance test should be conducted in situ, where the actual machine would be assembled. However, for many reasons, it is often conducted in the manufacturer’s factory with temporary base and foundation support. In either case, to analyze precise data, effects of environmental background noise as well as the structural resonances must be noted. Other than the performance of the machine, the acceptance test must evaluate 5 different characteristics: quality of design, manufacturing, assembly, installation, parts damages. The acceptance test manual, including location of vibration measurement, applicable sensors, evaluating criteria and the level of acceptance, m

Back

Acceptance Test Services

Ensuring introduction of a machine in perfect condition in the line is more important than perfect monitoring and diagnosis. To achieve this goal, the stage of acceptance test that precisely diagnoses and approves performance, design and the condition of the machine is required before the introduction or after the repair.

The acceptance test should be conducted in situ, where the actual machine would be assembled. However, for many reasons, it is often conducted in the manufacturer’s factory with temporary base and foundation support. In either case, to analyze precise data, effects of environmental background noise as well as the structural resonances must be noted.

Other than the performance of the machine, the acceptance test must evaluate 5 different characteristics: quality of design, manufacturing, assembly, installation, parts damages. The acceptance test manual, including location of vibration measurement, applicable sensors, evaluating criteria and the level of acceptance, must be provided to the manufacturer, and repairing engineers.

NADA Accepta



Field Instrument

Details


Mechanical

Details


Electrical

Details


Others

Details

Location

Jl. Hadiah 1 No 1190C
Grogol - Petamburan
Jakarta Barat - 11460
Indonesia

Phone

+6221 5697 2132
+6221 5697 2133

Fax

+6221 5695 4090

E-mail

sales@ac-engineering.co.id